Covered Boat Lift and Pier Head #5
Project Details Wear Deck composite decking 26 gauge metal roof and fascia Vinyl post sleeves and stainless handrail 10,000 lb. boat lift Jet ski lifts
Covered Boat Lift and Pier Head #5 Read More »
Project Details Wear Deck composite decking 26 gauge metal roof and fascia Vinyl post sleeves and stainless handrail 10,000 lb. boat lift Jet ski lifts
Covered Boat Lift and Pier Head #5 Read More »
Project Details Wear Deck composite decking 26 gauge metal roof and fascia 13,000 lb boat lift Jet ski lift
Covered Boat Lift and Pier Head #4 Read More »
Project Details Wear Deck composite decking 26 gauge metal roof and fascia 10,000 lb boat lift
Covered Boat Life and Pier Head #3 Read More »
Project Details Wear Deck composite decking (two tone) Wear Deck fascia trim board on dock Vinyl post sleeves and stainless handrail system 26 gauge metal roof and fascia 16,000 lb boat lift
Covered Boat Lift and Pier Head #1 Read More »
Project Details Wear Deck composite decking 26 gauge metal roof and fascia 10,000 lb boat lift
Covered Boat Lift and Pier Head #2 Read More »
HK&W Marine teamed up with their sister company Hawkins and Kolb to create a park for the Elgin Community to enjoy for many years to come. This project consists of a timber fishing pier, picnic shelter, board walk bridge, miles of accessible trails, and parking lot with stone sign.
Elgin Community Park Read More »
HK&W Marine has had the opportunity to work with Camp Woodie by providing several fishing platforms and an environmental learning dock. These docks will provide opportunities for children to fish and learn about the fresh water ponds the docks sit in. HK&W also constructed a Covered boat house. This boat house allows Camp Woodie to leave up to 15 canoes and pontoon in the pond with dedicated slips to tie to. The metal roof keeps rain water and debris out of the canoes. All decking at Camp Woodie is composite decking. This helps with long-term longevity and yearly maintenance.
South Carolina Waterfowl Association (Camp Woodie) Read More »
HK&W Marine construction worked with Dorchester county constructing a covered fishing pier, and a floating dock with aluminum gangway and double kayak launch. HK&W marine was also able to assist with the board walk construction that will allow the community access to miles of bike/ hiking trails.
HK&W Marine teamed up with Ben Cox LLC to create a public access at the foot of the old 301 bridge that runs parallel with current interstate 95. This project consists of a covered fishing pier with composite hand rails and composite decking.
Lake Marion Shores Read More »
HK&W marine worked together with Clarendon county and SCDNR to construct a public access spot for fishing and Kayak launch. This project scope included revamping an existing boat ramp, provided a floating dock for kayak and boat launch, timber fishing pier, benches and picnic tables, and asphalt parking for the community to enjoy.
Wyboo Fishing Access Read More »